How much notice does the inspector need when I am ready for an inspection?

The State Building Code states that the contractor must give the inspector 24 hours notice prior to the time when the inspection needs to be performed. It further states the Building Inspector shall make the inspection within 48 hours after such notification.

Show All Answers

1. When I start construction, is the work inspected?
2. Where should this card be kept?
3. Do I need to provide anything else to the inspector?
4. How much notice does the inspector need when I am ready for an inspection?
5. Can I call for plumbing and electrical inspections?
6. What does the inspector look for during the inspection?
7. Does the inspector carry identification?
8. Will the inspector ever come to my house without a call from me or my contractor?
9. Does someone have to be home during the inspection?
10. I’m having an addition built. When can I begin using it?
11. Is a Certificate of Use/Occupancy always required?
12. If I don’t get a Certificate, how do I know the work was completed satisfactorily?
13. Can I occupy my structure before all the work is done?