Traffic Improvements at Three Intersections

The City is working to advance designs to implement intersection improvements at three locations in Beverly, including:

  • Location 1: Rantoul Street, Cabot Street, Water Street
  • Location 2: Balch Street, McKay Street
  • Location 3: 1A, County Way, Route 97 (Henry’s Intersection)

Recent Updates:

Construction for Traffic Improvements at the Three Intersections will resume this Spring 2022

Night Paving (8pm-5am): Location 1 will take place the evenings of Wednesday August 31, 2022 and Thursday September 1,2022

May 16-20: Location 1

  • Continued curbing and sidewalk work

May 12-13: NIGHT WORK at Location 1

  • Paving binder from 8PM - 5AM

May 9-11: Location 1

  • Full depth patching

May 8: NIGHT WORK at Location 1

  • Milling from 8 PM - 5 AM

May 4-6: Location 1, 2 & 3

  • Location 1 installing curb and pouring sidewalks

April 25 - 29:  Location 1

  • Curb and sidewalk installation on Water Street

April 19 - 22:  Location 1

  • Curb and sidewalk installation on the right side of Cabot St (starting at the bridge)

April 14- 19: Location 1

  • Remove islands and full depth paving

April 10 - April 16: Location 1 and 3

  • Curb and excavation work at Location 1
  • Concrete sidewalk poured at Location 3

April 3 - April 9: Location 1

  • Light pole foundation installation
  • Catch basin clean out

March 28 - April 2: Location 3

  • Construction of Island on Dodge St
  • Curb installation at Fire station
  • Concrete driveway for Fire station

Find additional information on the Massachusetts Department of Transportation project page.