Three Intersections Project

The Three Intersections Project includes upgrades to the 1) Rantoul St/Cabot St/Goat Hill Ln/Front St/Water St intersection 2) Balch St/McKay St intersection and 3) Cabot St/County Way/Longmeadow Rd/Scott St/Dodge St intersection.

The project is at the 75% design phase. The project is scheduled to go out to bid in the fall/winter of 2019 and construction will begin in the Spring of 2020.

The 75% Design Plans can be found here.