Brimbal Ave/Rt.128 Overpass Project


The Brimbal Ave – Exit 19 Interchange Improvement Project is intended to promote safety, decrease congestion and improve access to properties in the Tozer/Sohier/Dunham Road area.  The project has been divided into two phases.  The first phase involves the redesign of the Connector Road leading from the Route 128 exit ramp to Brimbal Avenue.  The second phase of the project would require the construction of an overpass across Route 128 and improved direct local access to the highway, thereby reducing traffic volume and congestion in residential neighborhoods from visitors to the North Shore Music Theatre and other area businesses. Phase I improvements are being funded by a MassWorks Infrastructure grant. Construction has started and the contract has been awarded to the Dow Company.

A copy of the final traffic sign and pavement marking plan set can be found here. The entire set of final drawings can be viewed in the Engineering Department. A final project schedule provided by The Dow Company can be found here.


Roadway construction to begin April 4th, 2016. Full depth construction will begin from Otis Road to Herrick Street. Sidewalk and curbing construction will be ongoing throughout the entire roadway construction limits. Anticipate revised traffic patterns and roadway delays.